Getting more out of every operation with advanced custom solutions you can count on.

Built to Rotate. Engineered to Endure

Corrosion Engineering delivered a complete rotable chute package combining engineered chute design, heavy steel fabrication, custom ceramic lining and a purpose built support stand. The system allows the customer to maintain a fully lined chute ready for installation. When the operating chute is removed, it can be inspected and rebuilt while the prepared chute is installed, creating a repeatable rotation strategy for future maintenance cycles.

Read Case Study

CorroTile Lining System

Rotable Wet Mix Box

Corrosion Engineering designed and manufactured a complete wet mix box package for a severe duty mining application exposed to impact, sliding abrasion, slurry erosion, and corrosion. The solution included engineered equipment design, steel fabrication, and a high performance ceramic lining system. Corrosion Engineering allows the mine to remove a worn wet mix box for rebuilding while a replacement unit is installed. This rotable approach helps maintain circuit availability, simplifies maintenance planning, and ensures a fully lined replacement unit is ready for the next scheduled changeout.

Read Case Study

Corrotile Tripper Cars

CorroTile ceramic wear liners installed in Tripper Cars had a purchase price 5% less expensive than the previous ceramic cylinder liners and lasted over 8 times longer.

Read Case Study

Corrocube Conveyor Bangboard

5 times more cost-effective than the previous wear system, while lasting over 13.4 million tons.

Read Case Study

CorroTile Insert Chute

Establishing superiority of CorroTile, lasting over 5 times longer than alternative ceramic liners.

Read Case Study

CorroTile Transfer Chute

Highly cost-effective with 10 times the wear life of previous liners in a severely abrasive application.

Read Case Study

Corrocube Apron Feeder Chutes

Extended the uptime of the plant to 24 weeks and over 27 million tons resulting in huge savings.

Read Case Study

Cyclone Underflow Pipes

Extreme Cost-Effectiveness with 7 Times the Wear Life of Traditional Lined Piping

Read Case Study